Skip to content

Project and site freight

Construction haulage planned for the material and the site

Building products, plant and fabricated items require precise dimensions, suitable vehicle access, safe lifting and a delivery plan that reflects live site conditions.

A construction postcode rarely identifies the actual delivery point or safe approach. Gate location, access route, ground condition, turning space, site hours, induction and crane or forklift provision should all be confirmed. A banksman or timed escort may also be required by the principal contractor.

Material type determines the body and restraint method. Palletised products, long steel, timber, cabins and plant cannot be treated as equivalent flatbed freight. If the load is abnormal in size or weight, specialist planning and statutory requirements may apply; it should not be advertised as a routine return load.

Operational considerations

Details that materially affect the movement

Exact site access

The brief uses the working entrance, route instructions and responsible site contact rather than relying on the development’s general postal address.

Lifting agreed

Crane, forklift, HIAB or other unloading responsibility is confirmed at both ends so a standard vehicle is not sent to an unsupported lift.

Material-specific restraint

Weight, shape, support points and packaging inform the equipment required to prevent movement and protect workers during loading and unloading.

Prepare the brief

Information to provide

  • Provide the site gate, approach instructions and named delivery contact.
  • Confirm ground, height, width, turning and waiting restrictions.
  • State who provides lifting equipment and any booking or induction process.
  • Send accurate dimensions, weights, support points and restraint expectations.

Relevant examples

Typical planning scenarios

  • Palletised blocks delivered to a prepared site with forklift unloading confirmed.
  • Long fabricated steel collected and restrained on a suitable open trailer.
  • Packaged site equipment moved under a timed crane and banksman arrangement.

Examples describe legitimate use cases, not currently available loads, trucks or quoted prices.

Common questions

What to establish before moving forward

Can every construction load use a flatbed?

No. Freight dimensions, weight, weather sensitivity, lifting method and restraint may require a different or specialist vehicle, including a low loader or crane-equipped unit.

What if the site address has several entrances?

Provide the active delivery gate, route instructions and site contact. The wrong approach can create unsafe reversing, delays or a failed delivery for a large vehicle.

Who is responsible for securing the load?

Operators, drivers and consignors all have responsibilities. The loading and restraint system should be agreed, suitable and checked rather than left to assumption.

Freight to move?

Give the transport team the details that matter.

Share the collection, delivery, timing and freight information. Logic Freight will review the requirement and contact you about the next step.